Hollywood Tidal Flooding Mitigation and Shoreline Protection Sites 3,4,5,11 and 12 FDEP 22FRP13 – City of Hollywood

Hollywood Tidal Flooding Mitigation and Shoreline Protection Sites 3,4,5,11 and 12 FDEP 22FRP13 – City of Hollywood

Work under this Contract consists of furnishing all labor, materials, equipment, and incidentals required to furnish, deliver and install marine works as shown in the plans titled Tidal Floding Mitigation and Shoreline Protection, Sites 3, 4, 5,11 and 12 in a competent and professional manner and in compliance with all applicable safety and technical related codes and laws. The scope generally includes approximately 685 LF of  NZ-14 Steel Sheet Pile, 793 LF of pile cap, drainage pipe work, earthwork, concrete boat ramp, floating dock, mangrove trimming, landscaping and related work.   This project is funded with Federal Funds via the State of Florida Department of Environmental Protection. This solicitation shall be subject to Federal procurement standards as defined under Sections 200.317 through 200.327 of the Code of Federal Regulations (CFR), including all contract provisions/clauses under Section 200.327 of the CFR. As the project’s  Federal Funds are more than $10,000,000 from the SLFRF , the Build America, Buy America Act and Davis-Bacon Act does apply to this project

Hollywood Tidal Flooding Mitigation and Shoreline Protection Sites 3,4,5,11 and 12 FDEP 22FRP13

City of Hollywood Logo

Agency: City of Hollywood

Department: Design and Construction Management

Address: Sailor’s Point:

921 N. North Lake Dr.
Hollywood, FL 33019

Posting Date: 2024-12-11 19:46:14

Due Date: 2025-01-14 20:00:42

Project Type: Invitation For Bid

Ref: 175628

Check out for more detail: Official Bid Page

BidNiu. Unlock Winning Insights with AI-Powered Bid Analysis

Win Smart, Bid first with BidNiu!

Unlock Winning Insights with AI-Powered Bid Analysis

Get BidNiu for free

Categories

Scope of Services

Work under this Contract consists of furnishing all labor, materials, equipment, and incidentals required to furnish, deliver and install marine works as shown in the plans titled Tidal Floding Mitigation and Shoreline Protection, Sites 3, 4, 5,11 and 12 in a competent and professional manner and in compliance with all applicable safety and technical related codes and laws. The scope generally includes approximately 685 LF of  NZ-14 Steel Sheet Pile, 793 LF of pile cap, drainage pipe work, earthwork, concrete boat ramp, floating dock, mangrove trimming, landscaping and related work.   This project is funded with Federal Funds via the State of Florida Department of Environmental Protection. This solicitation shall be subject to Federal procurement standards as defined under Sections 200.317 through 200.327 of the Code of Federal Regulations (CFR), including all contract provisions/clauses under Section 200.327 of the CFR. As the project’s  Federal Funds are more than $10,000,000 from the SLFRF , the Build America, Buy America Act and Davis-Bacon Act does apply to this project

Transforming Spaces, Enhancing Lives.

Transforming Spaces, Enhancing Lives.

SDG California specializes in expert remodeling services, turning your home or business into a modern, functional, and beautiful space. From kitchen makeovers to full-home renovations, our team brings your vision to life with precision and quality craftsmanship.

Visit SDG California

Comments

No comments yet. Why don’t you start the discussion?

Leave a Reply

Your email address will not be published. Required fields are marked *