Construction of a new 62nd Ave. S superstructure (bridge no. 157408) and subsequent demolition and removal of the existing superstructure as well as the rehabilitation of the substructure and bulkhead caps. The bridge will be constructed in two major phases allowing for a single lane of traffic to be maintained throughout construction. The new superstructure will accommodate two lanes of traffic and a raised sidewalk.
62nd Ave S Over Maximo Channel – Bridge No. 157408 Replacement (Project No. 23080-100)
Agency: City of St. Petersburg
Department: Engineering
Address: 1 4th St N, Saint Petersburg, Fl 33701, Conference Room 600
Posting Date: 2025-03-10 20:19:32
Due Date: 2025-04-10 19:00:09
Project Type: Invitation For Bid
Ref: 187872
Check out for more detail: Official Bid Page

Win Smart, Bid first with BidNiu!
Unlock Winning Insights with AI-Powered Bid Analysis
Categories
- Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)
- Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
- Construction, Highway And Road
- Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps)
- Construction, Street (Major and Residential)(Includes Reconstruction)
- Construction, Utility/Underground Projects
Scope of Services
Construction of a new 62nd Ave. S superstructure (bridge no. 157408) and subsequent demolition and removal of the existing superstructure as well as the rehabilitation of the substructure and bulkhead caps. The bridge will be constructed in two major phases allowing for a single lane of traffic to be maintained throughout construction. The new superstructure will accommodate two lanes of traffic and a raised sidewalk.
The First Mobile Auction Application for Legal Assistance
Attorneys And legal professionals bid against each other To provide you with the best rates And support tailored To your needs.